Lot 2 at Parklane Estate presents a thoughtfully designed duplex with two spacious 3-bedroom, 2-bathroom dwellings, each with a double garage. With a combined build size of 352.56m² across a generous 1,035m² block, it provides a flexible opportunity for investors, owner-occupiers and multigenerational living.
Property Specifications
• 3 bedrooms, 2 bathrooms and double garage to each dwelling
• 175.97m² dwelling 1 and 176.59m² dwelling 2
• 352.56m² combined build size on a 1,035m² block
• Master suites with walk-in robes and private ensuites
• Open-plan living and dining to each dwelling
• Two separate dwellings within one duplex development
• Second water meter supporting dual-dwelling living
Key Inclusions
• 2,700mm high ceilings and N3 wind rating
• 1,200mm double entry doors
• Stone kitchen benchtops with 900mm kitchen appliances
• Custom floating bathroom vanities with upgraded sinks and tapware
• Soft-close cabinetry to kitchens and vanities
• 20+ LED downlights and feature external façade lighting
• Ducted air conditioning and roller blinds to both dwellings
• Stylish kitchen bulkheads above overhead cabinetry
• Extended driveway for additional vehicle space
• Enhanced landscaping and additional fencing
• Council infrastructure costs included
The Location – Connectivity & Convenience
Parklane Burnside Estate enjoys a highly connected position, offering the peace of natural surroundings while keeping everyday essentials within easy reach:
• 3–4 min drive to Burnside State School & High School
• 3–4 min drive to Nambour Hospital & Town Centre
• 4–5 min drive to Nambour Train Station
• 20 min drive to Sunshine Coast Airport
• 25 min drive to Mooloolaba Beach
• 25 min drive to Alexandra Headland Beach
Parklane Estate is a boutique 38-lot residential community at 68–116 Henebery Road, Burnside, positioned close to Nambour’s established services and amenities.
Invest in a Region on the Rise
The Sunshine Coast continues to benefit from significant public and private investment, supporting regional development and long-term confidence:
• $4.1B Sunshine Coast Airport Expansion
• $5.9B Maroochydore City Centre
• $3.2B Sunshine Coast Health Precinct
• $930M Bruce Highway Upgrade
Construction & Settlement
Currently under construction
• Civil Completion: October 2026
• Titles Registered: November 2026

Sales Director
0439-111-899
Send Email
Stay informed with the latest projects, new builds and updates about the latest market trends.